Caterpillar 730 Ejector Dump Truck (30t)

Wet Or Dry

Hire Options

350 hp

Engine Power

30T

Capacity

Available

Tunnel Spec

– Pushes material out instead of tipping
– Safer under powerlines or abutments
– Ability to Eject the material up or down hill
– Ease of operation and control with running out the material
– NO zone of influence for potential Tipper bin roll over

Spacious, quiet, and designed for operator comfort with improved visibility and easy-to-use controls.

Powerful 375 hp engine delivers reliability, fuel efficiency, and performance on tough sites.

Enclosed wet brakes on all axles for improved safety, durability, and reduced maintenance.

Wide Rims and Tyres fitted to all our 730 EJECTOR dump trucks

Tipper Body needs clearance above and clearance to the sides for zone of influence in case of a body roll over

No height and tipping zone of influence with Ejector body

Australia’s Leading Ejector Fleet

Caterpillar Ejector Dump Trucks

Safe. Reliable. Built for tough civil projects.

Proven Performance on Every Site

Our 30T Caterpillar 730 Ejectors deliver consistent load distribution and safer operation in tight spaces. With one of the largest ejector fleets in the Southern Hemisphere, JC Excavations is the trusted partner for major infrastructure and tunnelling projects.

Click to Hire

Projects Featured on

    Bringelly Rd Upgrade

    Road upgrade in Western Sydney; 10 km of Bringelly Rd widened to 4–6 lanes, improving safety, capacity, and connections to Western Sydney Airport and Leppington.

    Botany Rail Duplication

    Duplication of freight rail line between Mascot and Botany, enhancing port freight efficiency.

    Farley Wastewater

    Expansion and modernisation of Farley WWTP near Maitland to meet regional growth; increased treatment capacity.

    High St Penrith (Jane St/Mulgoa Rd)

    Upgrade to reduce congestion in Penrith; new lanes, improved intersections and active transport links.

    Inland Rail (Narrabri–North Star, Phase 1)

    Part of ARTC Inland Rail; 171 km of upgraded freight line with new bridges and track between Narrabri and North Star.

    M7–M12 Integration

    Major motorway interchange project linking M7 and new M12, improving airport and freight access.

    Mona Vale Rd East Upgrade

    Road widening, new median and safety upgrades along Mona Vale Rd East to improve traffic flow and safety.

    Moorebank Intermodal

    Construction of major logistics park and intermodal terminal at Moorebank; improves freight efficiency for Sydney.

    NIF Project (Mariyung Facility)

    Kangy Angy rail maintenance facility for the new Mariyung intercity fleet; depot for stabling, servicing, and maintenance.

    Northern Rd (Stage 2)

    Widening of Northern Rd at Bringelly to 4 lanes with safety improvements; part of Western Sydney Infrastructure Plan.

    Northern Rd (Stages 5 & 6)

    Continued widening of Northern Rd to 4 lanes, part of $1.6bn program supporting Western Sydney Airport.

    Old Windsor Rd Upgrade

    Road widening and intersection upgrades at Bella Vista; improves traffic flow and access to growing northwest Sydney.

    Sydney Light Rail

    12 km light rail network through Sydney CBD to Randwick/Kingsford (L2/L3). 19 stops, easing congestion and linking UNSW, hospitals, and Moore Park. Completed 2019–2020.

    Sydney Metro Stage 2

    Major tunnelling and stations package for Sydney Metro City & Southwest; Marrickville to Chatswood twin tunnels and stations.

    Sydney Metro West – Eastern Tunnelling Package

    Eastern tunnelling package for Metro West, delivering twin tunnels from Sydney CBD to The Bays.

    Sydney Metro West (Western Tunnelling Package)

    Delivery of twin tunnels between Sydney Olympic Park and Westmead as part of Metro West.

    WestConnex 3B (Rozelle Interchange)

    Complex underground interchange connecting WestConnex with Anzac Bridge, Iron Cove Link, Western Harbour Tunnel.

    WestConnex M4 East

    5.5 km twin motorway tunnels linking Homebush to Haberfield; easing congestion and connecting M4 to city. Opened 2019.

    WSA Cargo Stage 1

    Cargo terminal enabling works for Western Sydney Airport; earthworks, pavements, and services.

    WSA SSTOM

    Systems, Stations, Trains, Operations and Maintenance (SSTOM) package for Western Sydney Airport metro line.

Hire the

Ready to book this machine or learn more about availability and rates? Fill out the form below and our team will get back to you promptly.

No spam, ever.

Request Pricing

Whether it’s a single machine or a full fleet, we’ll price your hire fast. Just drop in the details below to get started.

No spam, ever.